Strom | Erdgas | Fernwärme | Beleuchtung | Fernwärmeförderung | Erdgasförderung | Strompreis | Erdgaspreis | Energiespartipps | Energiesparen | Graz
AA | HOME | SITEMAP | IMPRESSUM
 | PRESSE

It´s quite simple: You search for a connection and we offer you district heating at very attractive conditions:
The number of housing units per appartment building is the basis for the costs of the connection – there are no more complicated calculations with connection power and living space necessary.
The same applies to the arising expenses. You can choose single payment or you can pay a low monthly rate. From 25 housing units on, the monthly rate is only 1 Euro.

  • This connection model is available for new customers of district heating of Energie Graz. The property has to find itself in a place within the mains power supply or near a planned section of the network expansion of Energie Graz.


  • The monthly rate for the district heating connection is deducted once a year in the course of the regular district heating consumption billing and is also taken into consideration in the pre-invoice of the monthly rate. Instead of the monthly payment a one-off-payment after the construction of the connection is possible as well. If desired, Energie Graz can provide a special low price offer on request.


  • The pre-conditions for getting a district heating connection are the technical feasibility of the connection as well as the existence of the required authorization. Furthermore the connection model is only feasible at the in the respective price list named quorum of new customers in the apartment building.


  • The connection model applies for the shortest possible pipe. If more than six apartments are connected in the respective apartment building the length of the pipe must not exceed 30 meters. If less than six apartments are connected, the length of the pipe must not exceed 15 meters. Any additional pipe lengths desired from the customer – necessarily within the mentioned maximum distance – will be charged separately.


  • The financial support of Energy Graz and the country Styria for the prevention of particulate matter is elongated up to 31.12.2010. If one has the right to get the financial support, one has to bring the facility into service no later than 30.06.2011.


  • Future adjustments of the monthly payment for the district heating connection in the price lists are subject to change. For further information please call 0316/8057-9090 or send an e-mail to anschluss@energie-graz.at




From this district heating offensive both the air of Graz as well as you as a customer enjoy the many benefits. 

  • Comfortable, available energy at any time
  • Maintenance-free operation of the heating facility
  • Space-saving, because no storage space is required
  • High price stability
  • Prevention of particulate matter


The objective of Energie Graz is to argue further 20,000 residents of Graz in the coming years into the benefits of this modern energy source.

For further information please call 0316/8057-9090 or send an e-mail to

anschluss@energie-graz.at

 



Nutzen Sie die vielen Vorteile des elektronischen Kundendienstes - rund um die Uhr.
Haben Sie Fragen oder ein Anliegen?
Hier sind Sie richtig!
Treten Sie mit uns in Kontakt!
Um Meldungen über Störungen entgegen zu nehmen, haben wir für Sie einen Entstördienst 0-24 Uhr eingerichtet.
Unsere Experten beantworten gerne Ihre Fragen zu den Themen Wohnen und Energie.